Bathroom installations

Bathroom plumbing and installation

Individual fittings, plumbing upgrades and larger refurbishment work. Send the scope and photographs so we can confirm the next step.

How a bathroom job works

  1. 1

    Initial enquiry

    Tell us what you want to replace or change and share photographs of the existing room.

  2. 2

    Site visit

    We measure up, check the pipework, water pressure and hot water performance.

  3. 3

    Detailed quotation

    A written, itemised price so you can see exactly what you're paying for.

  4. 4

    Plumbing and installation

    Strip-out, first fix, suite and brassware installed, tested and commissioned.

  5. 5

    Professional finish

    Sealed, cleaned and left tidy — with everything demonstrated before we leave.

  • Supply your own fittings or use ours
  • Old suite removed and disposed of
  • Pipework and waste altered properly, not bodged

Completed bathrooms

Bathroom with sage green panelling, freestanding bath and traditional chrome towel radiator

Complete bathroom installation

Full refit with freestanding bath, panelled walls and a traditional heated towel rail.

Green-tiled walk-in wet room with brass brassware and wall-hung vanity unit

Walk-in wet room installation

Level-access shower area, wall-hung vanity and concealed cistern WC.

Cloakroom with blue panelling, illuminated round mirror and traditional towel radiator

Cloakroom refurbishment

Panelled walls, patterned floor and a traditional radiator with towel rail.

Shower room with dark stone-effect panels, glass enclosure and white vanity unit

Shower room refurbishment

Old suite removed, walls panelled and a new enclosure and vanity fitted.

Combined vanity and WC unit with round mirror and chrome heated towel rail

Vanity and WC unit fit

Combination unit fitted to make the most of a compact bathroom.

Traditional close-coupled WC with black seat beside a new shower tray

WC and shower tray replacement

New waste and supply connections with tiled walls and herringbone flooring.

Gledhill unvented hot water cylinder with new copper pipework and expansion vessels

Unvented cylinder installation

270 litre unvented cylinder installed with fully rebuilt copper pipework.

New copper pipework, isolation valves and expansion vessel beneath a wall-hung boiler

Heating pipework and controls

Neat copper pipework, magnetic filter and expansion vessel fitted to a system boiler.

Ask about bathroom work

Tell us about the job

We’ll prepare your details for WhatsApp. You must press send there, then attach any photographs.

Photographs are not uploaded here. Attach them safely in your WhatsApp conversation after the prepared message opens.

This does not confirm an appointment. We will reply about the scope, price and availability.